このページは国際安全衛生センターの2008/03/31以前のページです。
国際安全衛生センタートップ > 事例研究 > Examples of Hazard Prediction Training



Replacement of piping
A worker is tightening a bolt of hydraulic oil piping with a single ended spanner with an extension pipe.



Various Points of Hazard
1. The piping diameter is much larger than the grip of the spanner. It may slip off and the worker may be thrown down with his own force.


RETURN

NEXT

↑top